Jim’s procedureRotating assembly · in his orderIn his order
Mark and orient the rods
- Rods
- 1 to 8
- Odd
- Chamfer front
- Even
- Chamfer rear

Rods on the crank · the 357
Number every rod before anything goes together.
Check the oil hole
The shop drills each rod from the small end down to the big end. That carries oil from the rod journal up to the pin.
Positive lubrication!
Jim Draper
- Stage
- Rod oiling
- Floating pin
- .927″Fed by a beam-drilled rod
Mark them
- Write 1 to 8 on the bottom of each rod
With an arrow.
- Chamfer to the journal radius
Each rod’s chamfer faces the crank journal’s radius.
- Odd and even go opposite ways
See the map below.
Front · snoutRear · flywheel
1357
Chamfer to the frontToward the snout, on your left
2468
Chamfer to the rearToward the flywheel, on your right
- In plain English
- Chamfer
- The beveled edge on the side of the rod’s big end.
- Journal radius
- The rounded corner where the crank journal meets its cheek.
- Beam-drilled rod
- A rod drilled through its beam so oil reaches the pin.
What Jim names for it
Jim names it · ARPRod Bolts
Get itJim uses nothing but ARP; order rods with ARP bolts.
SummitARP 134-6003Large-journal 3/8″ rods.Jim names it · EagleI-Beam Rods, Bushed
Get itJim floats the pin in good steel I-beam rods ordered with ARP bolts.
AmazonEagle SIR5700BBLWConfirm small-end oil drilling.Jim names it · WORKPROSoft Vise Jaw Pads
Get itRods go in a vise with padded, smooth jaws, cap bolts up.
AmazonWORKPRO 4-1/2" pads