Jim’s procedureRotating assembly · in his orderIn his order
Crank oil-hole prep
- Order
- Crank first
- Taper
- Trailing edge
- Then
- Brush + air

Bottom end · the 357
Crank first. A very slight taper on every oil hole. Then every hole brushed and blown clean.
The taper
- Snout to your left
Lay the crank so the snout points left.
- Taper the trailing edge of every oil hole
A tapered hard roll on a die grinder. With the snout to your left, each taper points toward you.
- Keep it slight
A light touch. It only needs a little.
- Brush every hole
An oil-passage brush kit, from Summit or JEGS.
- Blow it out
Air through every hole. Blow it off and set it aside.
Don’t get carried away, just a very slight amount is all it needs.
Jim Draper
- Stage
- Crank oil holes
What Jim names for it
Jim names it · MorosoOil-Passage Brush Kit
Get itEvery oil hole gets brushed and blown out, block and crank.
AmazonMoroso 61820Jim names it · NuoDuncoCartridge Roll Kit
Get itRolls smooth the galley and put the slight taper on crank oil holes.
AmazonNuoDunco 50pc 2"Jim names it · Ingersoll RandAir Die Grinder
Get itAbout 50 hours of deburring and galley work happen on a die grinder.
AmazonIR 3101GJim names it · FlexzillaAir Blow Gun Kit
Get itBlow everything dry immediately so nothing flash-rusts.
AmazonFlexzilla AG1500FZKITNext on the bench
The rods. Check the oil hole the shop drilled, then mark every one.
NextMark and orient the rods