Jim’s procedureRotating assembly · in his orderIn his order
The ring gap clock
- Expander
- 12:00
- Reliefs
- Facing you

Pistons in the bores · the 357
Stagger every gap. Valve reliefs facing you, the piston seen from the top.
- Lower rail
- Lower-left skirt parting line
- Expander
- 12:00
- Upper rail
- Right parting line
- Second ring
- Dot up. Gap at the upper-left parting line
- Top ring
- Up mark up. For the gap position, follow the instructions in your ring set
