Rotating assemblyMark and orient the rods
Jim’s procedureRotating assembly · in his orderIn his order

Mark and orient the rods

Rods
1 to 8
Odd
Chamfer front
Even
Chamfer rear
Rods on the crank · the 357

Number every rod before anything goes together.

Check the oil hole

The shop drills each rod from the small end down to the big end. That carries oil from the rod journal up to the pin.

Jim’s call
Positive lubrication!

Jim Draper

Stage
Rod oiling
Floating pin
.927″Fed by a beam-drilled rod

Mark them

  1. Write 1 to 8 on the bottom of each rod

    With an arrow.

  2. Chamfer to the journal radius

    Each rod’s chamfer faces the crank journal’s radius.

  3. Odd and even go opposite ways

    See the map below.

Which way the chamfer facesSeen from the side, snout on your left
Front · snoutRear · flywheel
1357
Chamfer to the frontToward the snout, on your left
2468
Chamfer to the rearToward the flywheel, on your right
In plain English
Chamfer
The beveled edge on the side of the rod’s big end.
Journal radius
The rounded corner where the crank journal meets its cheek.
Beam-drilled rod
A rod drilled through its beam so oil reaches the pin.

What Jim names for it

Jim names it · ARPRod Bolts

Jim uses nothing but ARP; order rods with ARP bolts.

SummitARP 134-6003Large-journal 3/8″ rods.
Get it
Jim names it · EagleI-Beam Rods, Bushed

Jim floats the pin in good steel I-beam rods ordered with ARP bolts.

AmazonEagle SIR5700BBLWConfirm small-end oil drilling.
Get it
Jim names it · WORKPROSoft Vise Jaw Pads

Rods go in a vise with padded, smooth jaws, cap bolts up.

AmazonWORKPRO 4-1/2" pads
Get it
NextMeasure bearing clearance