For this build’69 Camaro · street/strip · 6–7k RPM’69 Camaro · 6–7k

50 hours of hand work

JD
Jim DraperFrom his shop notes · draft, Jim’s review pending
Lifter valley · the 357

About 50 hours, by hand, after the machine work. A die grinder with carbon steel bits and a cartridge roll kit. Every parting line deburred, the lifter valley ground to bare metal, the drain returns opened up.

The 357 lifter valley, ground to bare metal
Lifter valley · the 357
The 357’s lifter valley after the hand work.

The sequence

  1. Deburr the parting lines

    Every casting seam, inside and out.

  2. Grind the lifter valley to bare metal

    Die grinder and carbon steel bits, then the cartridge rolls.

  3. Open the drain returns

    So oil gets back to the pan.

  4. Tap the oil drip holes

    For the oil-hole breather plugs. Plug typeConfirming with Jim

  5. Pin locks and copper freeze plugs

    Freeze plug type TBCConfirming with Jim

What Jim names for it

Jim names it · CopperFreeze Plugs

Copper. Type confirming with Jim.

Compare
JD
Jim’s pick comingDie grinder + carbon steel burr set

Jim names the brand he runs. Until then we list nothing.

JD
Jim’s pick comingCartridge roll kit

Jim names the brand he runs. Until then we list nothing.

The full how-to is on the way: grit order, where not to grind, how long each area takes.

Affiliate links. We may earn a commission at no cost to you. As an Amazon Associate I earn from qualifying purchases.